Only 2 1/2 weeks until our walk through, it's amazing what they'll be able to get done in that amount of time! As of today most of our cabinets were installed, stone on the outside was done (it's the wrong stone, not sure what to do about that!), most of the outside is painted minus the garage door and the shutters which go on the two front windows, and the inside is mostly painted. The big things left to do include the driveway and walkway getting poured (hoping to catch them doing this so the kids can get their hand prints in it!), the rest of the cabinets installed, flooring and counter tops, plumbing and light fixtures, front yard landscaping, and hopefully getting us the right doors on the inside!